Jump directly to content

Fire test according to CEN/TS 1187, test 2

Name of service (page headline, shown in promos – maximum of 70 characters incl. spaces): Fire test according to CEN/TS 1187, test 2 Lead (include SEO-words and the main benefits for your target groups. Stick to one paragraph, maximum 2-3 sentences):

CEN/TS 1187, test 2  - Test method for external fire exposure to roof

Purpose/Benefit:

The test method measures the roofing's ability to prevent flame spread when exposed to a burning wood crib. The product can be classified according to EN 13501-5 after testing. The class is called BROOF(t2). Test reports can be used as a basis for P marking or as part of the technical documentation when a product is CE marked.

To be able to sell a construction product in Europe, the product must be tested, classified and if possible, CE-marked in accordance with the Construction Product Regulation. To meet the technical fire requirements, there are common test methods and a common classification system, EN 13501-1, also called Euroclass. This classification system is used by all EU countries, including Norway and Iceland. In Sweden the Building Regulations, BBR, use the Euroclass system.

Method (what/which methods are used to perform the service):

The test takes place inside a chamber that represents a sloping roof. The roof covering, in combination with the substrate, is mounted inside the test chamber. The tests is carried out at two different air velocity, 2 and 4 m/s. Three tests are performed at each air velocity. A wooden crib  is used as source of ignition. The test duration is 15 minutes or until the fire is extinguished or the flame has reached the upper part of the test body. During the test, the time from the test body is ignited and the time to the flame and the glow dies out. After the test, the length of damaged material is measured on the roofing and the substrate separately.

Delivery (what does the client get after performed service – e.g. a report, certificate etc.):

A test report, in Swedish or English, is deliverd with the test results after testing.

Area:
Fire safety
Construction
Risk and safety
Contact person (Enter one name per field. Activated personal contact pages will appear automatically):
Henrik Fredriksson, Projektledare
Susanne Blomqvist, Projektledare
CEN/TS 1187, test 2
Field measurements: No Price type: 1 Division: Division Safety and Transport Preparation: Description of preparation Preparation information:

Material consumption during testing.

  • Complete test, 6 test 2 air velocity, 10 specimen measuring 400 mm x 1000 mm.
  • Indicativ test, 1 test 1 air velocity, 2 specimen measuring 400 mm x 1000 mm.
Link to order form: Order Specification form Certification and marking: Not applicable Type of service: Testing / Analysis / Evaluation Instrument: Not applicable General area: Not applicable Order information: Before testing, please fill in the order specification form and attach it with your order. Divison (OLD): Division Safety and Transport Delivery level: Accredited
henrik.fredriksson@ri.se,susanne.blomqvist@ri.se
Order
ordering
Fire safety Sekundär områdes navigation:
Metrology
Construction
Tjänstetyp tagg: Provning

EN 1021 - Fire testing of upholstered furniture

Name of service (page headline, shown in promos – maximum of 70 characters incl. spaces): EN 1021 - Fire testing of upholstered furniture Lead (include SEO-words and the main benefits for your target groups. Stick to one paragraph, maximum 2-3 sentences):

EN 1021-1:2014 – Furniture – Assessment of the ignitability of upholstered furniture – Part 1: Ignition source smouldering cigarette.

EN 1021-2:2014 – Furniture – Assessment of the ignitability of upholstered furniture – Part 2: Ignition source match flame equivalent.

Purpose/Benefit:

The standards are used to assess the ignitability of material combinations, such as covers and fillings used in upholstered seating, when subjected to a smouldering cigarette and a match flame equivalent as ignition source.

These test methods only evaluate the ignitability of upholstery combinations. To evaluate the burning behaviour, the furniture needs to be tested in full scale with larger ignition sources.

For a upholstered furniture, the Product Safety Act applies and one of the safety risks is fire. According to the Swedish Consumer Agency, upholstered furniture sold to an individual consumer on the Swedish market must be able to withstand a glowing cigarette for a fixed time period without igniting the upholstery. The Agency then refers to the requirements according to EN 1021-1. In public environments, such as cinemas, hotels, restaurants etc., upholstered furniture should at least meet the requirements of both EN 1021-1 and EN 1021-2.  

Method (what/which methods are used to perform the service):

The tests are performed in a test cabinet with a calibrated air flow. Combinations of cover fabrics and filling materials used in upholstered furniture are tested. Cover fabrics can also be tested in combination with a standard PU filling. A steel test rig is mounted with the cover and filling so that a 90º angle is formed between the seat and back. The ignition sources are located in the junction between seat and back.

During the cigarette test the test assembly is not allowed to smoulder after one hour from the beginning of the test. The test assembly is also not allowed to smoulder to the extremities of the specimen.

The test assembly is subjected to a gas flame equivalent to a match flame for 15 seconds. No flaming is allowed to continue for more than 120 seconds after removal of the burner tube.

Prior to testing, all outer coverings that have been chemically treated to reduce their ignitability shall be  subjected to a water soaking and drying procedure, described in Annex D.

Delivery (what does the client get after performed service – e.g. a report, certificate etc.):

A test report, in Swedish or English, is deliverd with the test results after testing.

Area:
Fire safety
Construction
Risk and safety
Built environment
Textile
Contact person (Enter one name per field. Activated personal contact pages will appear automatically):
Henrik Fredriksson, Projektledare
Anna Bergstrand, Affärsutvecklare
Test with match flame according to EN 1021-2
Field measurements: No Price type: 1 Division: Division Safety and Transport Preparation: Description of preparation Preparation information:

Material needed for a complete test with 1 ignition source:

  • Cover/interliner/wadding, 2 pieces with the dimensions 800 x 650 mm
  • Filling, 2 pieces with the dimensions 450 x 300 x 75 mm
  • Filling, 2 pieces with the dimensions 450 x 150 x 75 mm

 The thickness of 75 mm regards the filling together with any wadding.

If the filling differs between the seat, back, armrests, etc. all fillings should be tested seperately.

Link to order form: Order specification form Standards:

Similar test standards:

ISO 8191-1 and ISO 8191-2

BS 5852-1

IMO 2010 FTP Code Part 8

Certification and marking: Not applicable Type of service: Testing / Analysis / Evaluation Instrument: Not applicable General area: Not applicable Order information: Before testing we ask you to complete the ”Order Specification form” and send this together with your order. Also attach product and safety data sheets when possible. Divison (OLD): Division Safety and Transport Delivery level: Accredited
henrik.fredriksson@ri.se,anna.bergstrand@ri.se
Order
ordering
Fire safety Sekundär områdes navigation:
Metrology
Construction
Textiles
Tjänstetyp tagg: Provning

Materials for use in wet areas - Research and innovation, testing, dam

Materials for use in wet areas
Materials for use in wet areas

RISE is the natural party for various actors in the area of wet areas materials for use in wet areas in terms of research and innovation, testing, damage investigations, training, certification and more. RISE has a unique pool of expertise and comprehensive resources.

RISE has great expertise and great resources in the field of materials for use in wet areas that can be made available to the business community.

Water damage is the most common type of damage in housing and costs society annually 6 billion SEK according to www.vattenskadecentrum.se. Other sources indicate 10 billion SEK annually. Water damage is not only costly to fix but also affects the working environment, housing environment and leads to unnecessary use of resources. These high figures for water damage we want to contribute to reducing.

Our goal is to coordinate, develop and market RISE the full competence and resources of the wet area so that society's costs for water damage can be reduced in the coming years.

RISE has extensive expertise and services in the wet room area, some examples are:

  • Testing according to many standardised methods, mainly for type testing as a basis for certification.
  • Special Tests of e.g. prefabricated bathroom modules, aids for the disabled, etc.
  • Damage investigations in wet areas.
  • Moisture calculations of different design designs of bathrooms etc.
  • Certification of wet-room products and compound wet-room systems by CE marking.
  • Testing and certification of the connection of waterproofing to gullies.
  • Testing and certification of wet room mudules

Several research projects have been carried out over the years. See Publications on www.diva-portal.org

By having a partnership with RISE in wet room issues, you can expect help and support from high-skilled people and access to laboratories with large resources.

Pontus Randén

Gruppchef
+46 73 020 85 20 Read more about Pontus
Profile image

Contact Pontus

CAPTCHA

* Mandatory 

By submitting the form, RISE will process your personal data.

Ingvar Demker

TIC-ingenjör
+46 10 516 53 08 Read more about Ingvar
Profile image

Contact Ingvar

CAPTCHA

* Mandatory 

By submitting the form, RISE will process your personal data.
Division (OLD): Do not use - Division Built Environment Division: Do not use - Division Built Environment Water Sekundär områdes navigation: Construction

Fire test according to EN ISO 1182

Name of service (page headline, shown in promos – maximum of 70 characters incl. spaces): Fire test according to EN ISO 1182 Lead (include SEO-words and the main benefits for your target groups. Stick to one paragraph, maximum 2-3 sentences):

EN ISO 1182 - Reaction to fire tests for Products - Non-combustibility test

Purpose/Benefit:

The fire test has been developed for constrution Products wich, whilst not completely inert, produce only a very limited amount of heat and flame when exposed to temperatures of 750º C approximately. The main purpose of the test is to classify a product A1 or A2 according to the European classification system.

To be able to sell a construction product in Europe, the product must be tested, classified and if possible, CE-marked in accordance with the Construction Product Regulation. To meet the technical fire requirements, there are common test methods and a common classification system, EN 13501-1, also called Euroclass. This classification system is used by all EU countries, including Norway and Iceland. In Sweden the Building Regulations, BBR, use the Euroclass system.

Method (what/which methods are used to perform the service):

A test specimen is located inside a cylindrical furnace tube at 750 °C. The furnace and specimen temperatures are measured continuously during the test. Potential combustion of the test specimen is registered as temperature rise and/or visible flames. Mass loss of the test specimen is calculated after the test. These parameters are used to decide if the product is non-combustible or not.

Delivery (what does the client get after performed service – e.g. a report, certificate etc.):

A test report, in Swedish or English, is deliverd with the test results after testing.

Area:
Fire safety
Construction
Risk and safety
Contact person (Enter one name per field. Activated personal contact pages will appear automatically):
Susanne Blomqvist, Projektledare
Per Thureson, Senior Projektledare
EN ISO 1182
Field measurements: No Price type: 1 Division: Division Safety and Transport Preparation: Description of preparation Preparation information:

Material consumption during test:

Complete test

  • 12 test specimens, cylindrical with the diameter 45 mm and height 50 mm.

Indicative test

  • 2 test specimens, cylindrical with the diameter 45 mm and height 50 mm

If the thickness of the product is thinner than 50 mm sufficient number of horizontal layers of the material shall be used to adjust the thickness to 50 mm.

Link to order form: Order Specification Form Standards:

Similar test methods: IMO 2010 FTP Code Part 1

Certification and marking: Not applicable Type of service: Testing / Analysis / Evaluation Instrument: Not applicable General area: Not applicable Order information: Before testing we ask you to fill in the Order Specification form and attach your order Divison (OLD): Division Safety and Transport Delivery level: Accredited More information:

Relaterade provningsmetoder och mer information om CPR finns nedan.

Order
ordering
Fire safety Sekundär områdes navigation:
Metrology
Construction
Materials and durability
Tjänstetyp tagg: Provning

Investigation, evaluation and field measurements of ventilation function

Name of service (page headline, shown in promos – maximum of 70 characters incl. spaces): Investigation and field measurements of ventilation in buildings. Lead (include SEO-words and the main benefits for your target groups. Stick to one paragraph, maximum 2-3 sentences):

RISE can conduct independent investigations, evaluations and, if necessary, limited field measurements of the ventilation function in different types of buildings. Ventilation function in the form of air flows, air quality and thermal comfort, as well as heat recovery and electrical efficiency.

Purpose/Benefit:

As an independent part assist users and/or property owner in investigating, evaluating and, if necessary, making limited field measurements of the ventilation function in their buildings, usually in connections with them being uncertain or having complaints about the ventilation function. RISE does not carry out adjustments or routine ventilation checks, such as OVK, but refers such assignments to consultants who routinely perform this type of service.

Through RISE's accumulated and long-standing experience in the ventilation area (theoretical/academic as well as from laboratory tests and field assignments) we have a broad and deep knowledge of how ventilation systems work and what can be wrong and cause problems.

Many problems with indoor environment and/or high energy use are due to faults and deficiencies in the function of ventilation. There may be errors in the design as well as during the installation or in the operation and control of the system.

 Many times, users or operating staff have not received enough information and knowledge about how the system works and how it should be managed. 

Method (what/which methods are used to perform the service):

The customer's need is identified via telephone and/or e-mail. Then an indication of price and delivery time is first given. If the customer is still interested, we may request additional documentation in the form of drawings, protocols, etc. before we write a formal quote. Since a fixed price is often difficult to give, the work is usually offered on a current hourly rate up to a maximum price. 

If the quotation is accepted, a time for ocular inspection and eventual measurements is then determined in consultation with the customer. Often, an ocular examination is enough to give a statement on the function of the ventilation and any suggestions for measures. In some cases, more detailed measurements may need to be performed, either by RISE or by another actor.

Delivery (what does the client get after performed service – e.g. a report, certificate etc.):

Usually, the customer receives a report that describes the background, implementation and results. For shorter projects, simplified reporting can be done via e-mail, possibly with attachments in the form of pictures, tables and/or diagrams.

Delivery time:

 Depending on already planned assignments, project start-up time can normally vary between 1 - 4 weeks. Depending on the scope of the project and possible need for measurements, implementation can take anywhere from a few days to several months. In the latter case, of course, not full time.

Factors that affect delivery time are coordination with other actors, e.g. sub-consultants, or that certain measurements require a certain outdoor climate or a certain internal load.

Area: Energy Contact person (Enter one name per field. Activated personal contact pages will appear automatically):
Per Kempe, Senior forskare
Svein Ruud, Teknisk lic
Field measurements: Yes Price type: 2|Tjänstens pris (om tillämpat, t.ex prispaket, prislistor) Priceinformation:

Price on request for quotation. Usually on a current hourly rate up to a maximum price which can be increased after agreement with the customer.

Division: Do not use - Division Built Environment Preparation: Description of preparation Preparation information:

Preparations are normally required in the form of coordination with other assignments, contacts with customers and other actors, review of documentation, find the appropriate date for on-site inspection, book any measuring equipment and means of transport.

Certification and marking: Not applicable Type of service: Testing / Analysis / Evaluation Instrument: Not applicable General area: Not applicable Order information: Please contact us for more information. Divison (OLD): Do not use - Division Built Environment Delivery level: Not applicable
per.kempe@ri.se,svein.ruud@ri.se
/en/node/9710
Order
form
Construction Sekundär områdes navigation:
Metrology
Health and life science
Tjänstetyp tagg: Konsultuppdrag

ETA - Preparation/Issuance of European Technical Assessments, and preparation of European Assessment Documents (EAD)

Name of service (page headline, shown in promos – maximum of 70 characters incl. spaces): ETA – European Technical Assessment Lead (include SEO-words and the main benefits for your target groups. Stick to one paragraph, maximum 2-3 sentences):

RISE is a state-appointed body authorized to issue European Technical Assessments (ETAs). For products where no harmonized technical specification exists or can be fully applied, the ETA route is the way for manufacturers to CE mark their products.

Purpose/Benefit:

CE marking is the key to the entire EU market. With a CE marking, you can:

  • sell your products freely within Europe
  • clearly demonstrate that your product meets common quality and safety requirements
  • strengthen your brand through transparency and reliability

When there's no harmonized standard, an ETA is the best way to get CE marking. The ETA describes the product's features, manufacturing process, and control procedures—everything needed to give the market security and confidence.

As Sweden's Technical Assessment Body (TAB), RISE issues ETAs in all product areas. We also represent Sweden in EOTA, the European organization that develops EADs. This means that you get a partner that both drives the process and influences European guidelines.

Method (what/which methods are used to perform the service):

Our work process is designed to be smooth and transparent:

  1. Request
  2. Quotation
  3. Preparation of EAD, if missing
  4. Preparation of ETA

Once all product information, manufacturing data, and control plans (FPC) are in place, we can issue an ETA.

Depending on which AVCP system the product is covered by, additional third-party review may be required. As one of Sweden's leading notified bodies, RISE can also assist with these aspects.

Delivery (what does the client get after performed service – e.g. a report, certificate etc.):

Once the above steps have been completed, an ETA is issued. References to ETAs are published on both the RISE website and the EOTA website.

Area: Certification Contact person (Enter one name per field. Activated personal contact pages will appear automatically):
Daniel A Andersson, TIC-ingenjör
Stefan Coric, Gruppchef
Field measurements: No Price type: 1 Division: Do not use - Division Built Environment Preparation: Description of preparation Preparation information:

No special preparations are required, but a clear definition of the product and its intended use, including any limitations is a great advantage.

Certification and marking: Not applicable Type of service: Certification Instrument: Not applicable General area: Not applicable Order information: Apply for an ETA by filling out the specific ETA application form. This form will be supplied by RISE in conjunction with the initial contacts. Divison (OLD): Do not use - Division Built Environment Delivery level: Not applicable
daniel.a.andersson@ri.se,stefan.coric@ri.se
/en/node/9710
More information:

Purpose - Header: Why CE mark through RISE? Metod - Header: A clear and effective process Delivery - Header: Delivery
Request for quote
form
Construction Sekundär områdes navigation: Metrology Tjänstetyp tagg: Certifiering

TRIBE 2020

TRIBE 2020

The TRIBE project aspires to achieve positive behavioral change in terms of energy efficiency habits in public spaces. Its main approach is through a mobile game linked to real-time data from five pilot buildings with potentially 12,000 visitors. The game employs an interdisciplinary approach of game design, behavioral theory and energy simulation.

Teknisk utveckling, spelteori och speldesign
Completed
Design Energy
3 år
Division: Division Digital Systems and Societal Transformation

 

The project is based on a series of components such as energy monitoring, simulation, social studies, game design and integration of all components in a mobile game.

Through cluster analysis of users, three clusters were identified for each of the project's 5 virtualized pilot buildings. These can be used for games to characterize the effectiveness of agent-based behavior in relation to heating, cooling, lighting and the use of electrical appliances. Empirically observed and energy related behavioral patterns range from the least effective to the medium effective and the most effective, as indicated by mean values ​​for different activities (1 = least effective, 5 = most effective).

Although games and digital games can be described as simulations, there are fundamental differences in the general approach of implementing visual games, physics simulations and technical simulations. Within games it is a requirement that feedback takes place in real time with low, perceived latency. Technical simulations, such as energy simulation in building planning, require a level of detail that today is not possible in real time. The TRIBE project advocates an approach inspired by the gaming industry where energy simulation can be segmented in pre-calculated and real-time simulation. This is like how a game "prizes" graphics and "bakes" lighting to limit real-time simulation.

The mobile game has been installed by more than 18,000 users and has received an average rating. The exact effect of increased energy efficiency could not be determined within the project's limitations, but the tools and methods in the project have proved to be reusable and relevant.

Peter Ljungstrand

Forskare
Read more about Peter
Profile image

Contact Peter

CAPTCHA

* Mandatory 

By submitting the form, RISE will process your personal data.
Projekt logo: TRIBE's logotype Project end date: Sekundär områdes navigation:
Construction
Digitalisation

Rock mechanical testing

Name of service (page headline, shown in promos – maximum of 70 characters incl. spaces): Rock mechanical testing Lead (include SEO-words and the main benefits for your target groups. Stick to one paragraph, maximum 2-3 sentences):

As infrastructure projects grow in size, higher utilization of the rock material is required to keep building costs down while maintaining security. Dimensioning models and calculation, which can be used, for example in planning require detailed knowledge of rock mechanics and the properties of different rock materials.

Purpose/Benefit:

In our rock mechanical laboratory there is equipment for rock mechanical testing which in some parts is unique in the country. This gives the opportunity to be able to carry out tests, for example in connection with the construction of infrastructure projects or for purely research purposes.

We can offer different testing methods. In addition to these, it is possible to do special tests as desired, as there is a wide range of mechanical testing equipment and extensive testing expertise in the various laboratories.

Among other things, we have carried out a large assignment for Svensk Kärnbränslehaltning AB (SKB) concerning advanced rock mechanical testing in connection with the design of the work on site investigations for the storage of spent nuclear fuel. Since then, SKB has asked for new knowledge about the mechanical properties of the rock materials. RISE has subsequently developed certain parts of the test methods to obtain new types and improved results.

Method (what/which methods are used to perform the service):

We carry out many methods based on ASTM and ISRM standards. Upon request, we can incorporate more methods as we have a wide equipment bank. Our equipment is adapted for rock mechanics testing of high quality. We can perform uniaxial compression tests, triaxial compression tests, indirect tensile tests (brazilian tests), direct tensile tests, point load strength, cerchar abrasivity test, density, porosity, water content, normal load and direct shear tests, unaxial and triaxial fracture behavior etc.

We can solve transport between drilling site and RISE laboratory in Borås.

We can also drill cores from stones for testing.

The work include both accredited and non-accredited testing methods. The scope of accreditation is available upon request – please feel free to contact us for more information.

Delivery (what does the client get after performed service – e.g. a report, certificate etc.):

We deliver report, diagram and pictures before and after testing with white background.

Delivery time:

In the case of normal workload, we can start testing within two weeks of receiving the sample and finish the report within one week after the end of the test.

Area:
Testing
Built environment
Contact person (Enter one name per field. Activated personal contact pages will appear automatically):
Lars Jacobsson, Senior forskare
Caroline Hanquist, Ingenjör
Rock mechanics UCS Unaixial compression with LVDTs
Field measurements: No Price type: 1 Division: Division Materials and Industry Preparation: No preparation required Standards:
  • ASTM D7012-14e1 Standard Test Methods for Compressive Strength and Elastic Moduli of Intact Rock Core Specimens under Varying States of Stress and Temperatures
  • ASTM D3967-16 Standard Test Method for Splitting Tensile Strength of Intact Rock Core Specimens  
  • ASTM D5731-16 Standard Test Method for Determination of the Point Load Strength Index of Rock and Application to Rock Strength Classifications
  • ASTM D2216-19 Standard Test Methods for Laboratory Determination of Water (Moisture) Content of Soil and Rock by Mass
  • ASTM D7625-10 Standard Test Method for Laboratory Determination of Abrasiveness of Rock Using the CERCHAR Method
  • ISRM 1974 Suggested methods for determining shear strength
  • ISRM 1983 Suggested methods for determining the strength of rock materials in triaxial compression
  • ISRM 2013 ISRM Suggested method for determining the abrasivity of rock by the CERCHAR Abrasivity Test
  • Additional methods according to ASTM and ISRM
Certification and marking: Not applicable Type of service: Testing / Analysis / Evaluation Instrument: Power / torque sensors General area: Force and torque Order information: Order the services by calling or emailing the contacts. Divison (OLD): Division Materials and Industry Delivery level: Not applicable
lars.jacobsson@ri.se,caroline.hanquist@ri.se
/en/node/9710
More information:
Image: Caroline Lägermo

Set up of triaxial compression of a rock sample with local and global axial deformation measurement and radial deformation measurement with LVDTs.


Image: Caroline Lägermo

Set up of uniaxial compression (UCS) of a rock sample with local axial deformation measurement and radial deformation measurement with LVDTs.


Image: Caroline Lägermo

Set up for indirect tensile (Brazilian) test.


Image: Caroline Lägermo

Cerchar abrasivity specimen. The sample is scratched with one tip per scratch. The abrasion of the tips is then measured and the hardness of the rock specimen is classified.

9. Industry, innovation and infrastructure
11. Sustainable cities and communities
Order
form
Construction Sekundär områdes navigation:
Infrastructure
Metrology
Materials and durability
Tjänstetyp tagg: Provning

Fire furnaces for testing the fire resistance of constructions

Fire testing furnaces
Fire test furnace

A test bed for evaluating different constructions' fire resistance using extensive equipment. World-leading flue gas treatment and mobile work platforms to facilitate customers' assembly contribute to sustainability. The furnaces can be controlled according to the toughest fire curves required by the market.

Isolated testbeds (IT)
Västra Götaland Region

Patrik Johansson

Affärsutvecklare
+46 10 516 50 92 Read more about Patrik
Profile image

Contact Patrik

CAPTCHA

* Mandatory 

By submitting the form, RISE will process your personal data.
Off
Division: Do not use - Division Built Environment

The test bed is the only facility in Sweden that has authorized and approved equipment with which to perform fire certification. It is in addition a meeting place for university or industry conducted scientific research lead by professors and post graduates, constituting a major resource for testing and developing new constructions. 

In the horizontal furnace you can examine beams, floors, ceilings, baulks, ventilation dampers, filing cabinets and vessel decks. The vertical furnace offers the same examination but covering walls, doors, windows, glass sections, penetration seals, vessel bulkheads and cable functionality. 

The testing equipment is utilized by product developers from a wide range of fields where issues regarding fire can arise, not to mention importers looking to certify products. Around 30-40% of the tested products are manufactured outside of Sweden.

World-leading treatment of flue gas and extinguishing water

The fire test furnaces are part of the fire lab in Borås that works sustainably. Flue gas and extinguishing water from the entire lab are handled in a complicated treatment plant. Particles from smoke and toxic parts of extinguishing water are separated and placed in landfills.

Mobile work platforms for our customers

To offer a safe and easy-to-work work environment, there are height-adjustable platforms that belong to our workplaces for mounting vertical products and structures. Our customers, who are always responsible for assembling their test specimen, appreciate our workplaces and believe that the platforms also provide a faster assembly, which reduces their labor costs.

Fire curves and load

Our customers meet different fire requirements depending on which market they operate in. We have developed the furnaces so that they can be controlled according to everything from the lowest temperature curves, for e.g. fire ventilators, to the toughest, for e.g. tunnel products called RWS.

Rigs with hydraulic systems belonging to the furnaces can apply load to structures so that they are evaluated exposed to fire under load. Load-bearing floors and load-bearing walls are evaluated in this way. Our load system for the horizontal furnace is very flexible and each point that is loaded can be controlled separately during the same test.

Buildings and infrastructure Security and defence
Fire safety
Not applicable
1975

Address

Brinellgatan 4, Borås

Fire safety Sekundär områdes navigation:
Metrology
Construction
Maritime

Testing of plastic pipes according to European and International standards.

Name of service (page headline, shown in promos – maximum of 70 characters incl. spaces): RISE Pipe Center- Plastic Pipes Lead (include SEO-words and the main benefits for your target groups. Stick to one paragraph, maximum 2-3 sentences):

The Pipe Centre offers a variety of services that range from testing, evaluation and assistance with certification, to troubleshooting and R&D in materials, products and their use in pipe systems.

Purpose/Benefit:

Testing and verification of plastic pipes according to international and european standards. RISE Pipecenter is accredited for about 120 testing methods.

RISE Pipe Center is one of the laboratories trusted by INSTA-CERT to perform audit inspections and audit testing within the scope for Nordic Poly Mark, which is the most well known certification sheme for plastic pipes in the nordic countries.

Independent testing and quality assurance for standardised products.

Method (what/which methods are used to perform the service):

The testing is most commonly performed according to a method standard or other referenced document. The testing parameters can also be decided in collaboration with the client.

Delivery (what does the client get after performed service – e.g. a report, certificate etc.):

The client recieves a written digitally signed testing report with test results and comparison to standard requirements.

Area:
Construction
Certification
Production and manufacturing
Built environment
Water
Contact person (Enter one name per field. Activated personal contact pages will appear automatically): Razvan Marin, Senior ingenjör
Plaströrsbild
Field measurements: No Price type: 1 Division: Do not use - Division Built Environment Preparation: No preparation required Standards:

The most common product standards for RISE Pipe Center are listed below. 

  • EN 12201
  • EN 1555
  • EN 1329
  • EN 1451
  • EN 1401
  • EN 1852
  • EN 13476-2
  • EN 13476-3
  • SPF 1200
  • SPF 1300
  • NPG PS 102
  • EN ISO 13598-1
  • EN ISO 13598-2
  • EN ISO 15875-2
  • INSTA CERT PS 102
  • INSTA CERT PS 116
Certification and marking: Not applicable Type of service: Not applicable Instrument: Not applicable General area: Not applicable Order information: For more information contact us Divison (OLD): Do not use - Division Built Environment Delivery level:
Accredited
Non-accredited
razvan.marin@ri.se,
/en/node/9710
Application of interest
form
Plastics Sekundär områdes navigation:
Infrastructure
Metrology
Construction
Tjänstetyp tagg: Provning