3D BluePrint explores how digital design and additive manufacturing can enable site-specific fauna passages at hydropower plants, dams and other migration barriers. The aim is to support more efficient environmental adaptation while strengthening ecological connectivity and biodiversity in freshwater ecosystems.
3D BluePrint is a feasibility study exploring an industrial process for the digital design and additive manufacturing of site-specific fauna passages. The solutions are intended for hydropower plants, dams and other migration barriers.
The project aims to define and evaluate a quality-assured process covering the entire chain from site data and biological requirements to design, manufacturing, installation and verification. The study will establish a requirements framework, a process architecture and a roadmap for a future demonstration project.
Hydropower plants and dams create migration barriers that can restrict the movement of fish and other aquatic organisms between habitats. At the same time, fauna passages must be adapted to local conditions, target species, water flows and existing infrastructure.
Conventional solutions may require extensive groundwork, large structures and long implementation periods. More flexible and resource-efficient methods are therefore needed to combine ecological functionality with technical feasibility, cost efficiency and consideration of hydropower generation.
The project uses Åstafors hydropower plant as its primary reference case. Activities include site characterisation, requirements definition, digital modelling and simulation, and assessments of materials, additive manufacturing, logistics and installation.
By combining biological and hydraulic knowledge with digital design and 3D printing, the project investigates how fauna passages can be tailored to a particular site while being produced through a repeatable, quality-assured process. The project will also develop a plan for technical, biological and regulatory verification.
In the longer term, the project can contribute to more cost- and resource-efficient environmental adaptation at hydropower plants and dams. Site-specific fauna passages can improve ecological connectivity and strengthen biodiversity in lakes and watercourses.
The project will also expand knowledge of how digital design and additive manufacturing can be applied to complex water infrastructure. It contributes to UN Sustainable Development Goal 9, Industry, Innovation and Infrastructure, and Goal 15, Life on Land.
3D BluePrint
Active
Västra Götaland Region
RISE serves as coordinator and project manager, and leads the development of the project's process architecture, requirements framework, and roadmap for verification and demonstration.
11 months
975,015 SEK
Ätrans Vattenråd, Svensk Vattenkraftförening (svaf), Assman Ätran Kraft AB, WaterCircle Göteborg AB, Vessige Vattenkraft AB, Sydkraft Hydropower AB
VINNOVA - Sveriges innovationsmyndighet
RISE Research Institutes of Sweden