Fully Dynamic Medium Voltage Cables for Ocean Energy, Reliable transmission

The main goal of the SEASNAKE project is to provide a step change in the overall performance of a medium voltage cable system, while ensuring that they are highly reliable and lower the risks of ocean energy installations.

cable dissication

The main goal of the SEASNAKE project is to provide a step change in the overall performance of a medium voltage cable system, while ensuring that they are highly reliable and lower the risks of ocean energy installations.

The specific objectives are:

•Objective 1: To increase the economic viability of OWC systems by reducing the Levelised Cost of Electricity (LCOE) at least 20%

•Objective 2: To proof that 95% availability can be achieved with an improved design for reliability, maintainability and survivability of all cable sub-systems, validated in a relevant environment, reaching TRL7

•Objective 3: De-risk and optimise the offshore operations

•Objective 4: Demonstration of dynamic cable solutions

•Objective 5: Minimise environmental impact


Summary

Project name

Seasnake

Status

Active

Region

Region Dalarna, Region Stockholm, Västra Götaland Region, Other than Sweden

RISE role in project

Coordinator, ocean testing, reliability assessments, anti-fouling

Project start

Duration

2 years

Total budget

5.5MSEK

Partner

NKT Cables, Wavec, Chalmers TH, I-tech, Wave Venture, Waves4Power, CorpowerOcean, Oceanharvesting Technologies, IFSTTAR, MWA Coatings

Funders

OceanERA-NET, Energimyndigheten

Coordinators

Project members

Supports the UN sustainability goals

7. Affordable and clean energy
9. Industry, innovation and infrastructure
14. Life below water
Johannes Hüffmeier

Contact person

Johannes Hüffmeier

Senior projektledare

+46 10 516 62 44
johannes.huffmeier@ri.se

Read more about Johannes