När elnätstationer moderniseras och byggs mer kompakt kan det ge fördelar som mindre markanspråk och kortare byggtid. Samtidigt kan utformningen påverka möjligheterna att begränsa skador och återställa elförsörjningen efter ett väpnat angrepp. I projektet undersöker RISE hur olika stationslösningar påverkar resiliensen vid väpnat angrepp.

About the project

Substation renewal and new-build projects increasingly use solutions designed to reduce the physical footprint, construction time or cost of the substation. Examples include short cable sections at the substation connection, reduced clearances between high-voltage components, indoor substations and gas-insulated switchgear (GIS).

These solutions may be well justified under normal operating conditions, but may also affect a substation’s resilience to attacks during war. For example, a more compact design may affect the number of components damaged in a single attack. Different technical solutions may also affect the feasibility of temporary emergency repairs and create dependencies on specific spare parts, suppliers and specialist expertise.

Objective

The objective of the project is to investigate and compare how different modernisation and compact substation solutions affect the resilience of substations to attacks during war.

The project will identify solutions and design approaches that may present particular challenges for damage mitigation, restoration or temporary repairs. The results will provide a basis for recommendations on which solutions should be avoided or subject to specific requirements where a high level of resilience is essential.

Method

The project uses an older air-insulated substation as its reference case. The reference case is analysed using Monte Carlo simulations and compared with a number of representative compact substation configurations.

For the compact configurations, expert-based role-playing exercises are used to examine restoration times, access to spare parts, the need for specialist expertise and the feasibility of temporary repairs. The results of the simulations and role-playing exercises are then compiled into a comparative analysis.

Expected results

The project will provide electricity network operators with a stronger basis for incorporating resilience into decisions concerning the design, reinvestment and modernisation of substations. Among other things, the results will show whether certain technical solutions or construction approaches may make repairs and restoration more difficult following an attack during war.

Summary

Project name

Resilience of compact substations

Status

Active

Region

Region Stockholm

RISE role in project

Project manager

Project start

Duration

8 months

Total budget

500 000 SEK

Funders

Energiforsksprogram för Risk- och tillförlitlighetsanalys

Project members

Tommie Lindquist

Contact person

Tommie Lindquist

Forskare

+46 10 516 57 79

Read more about Tommie

Contact Tommie
CAPTCHA

* Mandatory 

By submitting the form, RISE will process your personal data.