Utility
As a part of creating a sustainable society, we offer unique possibilities to test your concept for a cyclic energy system, being able to test different setups and measure the quality of in- and outgoing resources to optimize the system.
Example projects are
- The datacenter as in integrated part of the energy system
- Power quality effects on the datacenter operation
- Waste heat reuse in industry application e.g. wood drying, pre-heating
- Datacenter as a micro-grid
- District heating and datacenter operation
For more information please contact us at info@ri.se
The incoming infrastructure setup and specifications look as follows:
SPECIFICATIONS
INFRASTRUKTUR SET UP
Power: 84 kW per module. Total 240 kW
Backup: UPS power 19 minutes at full load
Water supply: regular local water utility
1Gb primary internet connectivity, with possibility to scale up to 10 Gb or higher
DEN INTERNA UTILITY INFRASTRUCTURE
Solar panel system 10 kW
Energy storage 4,2 kW
Cooling water storage
Power switch board to connect to local utility