Valves

Shut-off valves for district heating networks are tested for tightness, strength and opening and closing torque.

Purpose

To test long-term properties in the form of tightness and manoeuvrability, cycling tests are conducted with opening and closing. Testing in accordance with European standard EN 488: 2019 may form the basis for certification according to the Euroheat & Power certification program EHP 003. RISE is a test institute and certification body according to EHP 003 approved by Euroheat & Power.

Valves for other applications in the industry can also be tested in a similar way.

Certification takes place according to the European industry standard EHP 003, which is based on testing according to the European standard EN 488: 2019. A certified valve is therefore attractive in the entire European market.

Valves up to a size of DN 1000 can be tested, which means that valves up to DN 2000 can be certified according to EHP 003.

A tested and certified valve proves quality and that the valve can maintain high performance for a long time.

Method

Cycling and manoeuvring test according to EN 488: 2019. The test method EN 488: 2019 is intended for stretch limit valves which may be subjected to high axial expansion forces from connecting district heating systems. The valve is operated under load and the opening and closing torque and the tightness after the test are checked. The testing is supplemented by continuous checks at the manufacturer, which ensures that the valves produced are of the same quality as the specimens tested. An EHP 003 certificate is valid for 6 years. In the test rig we can pressurize the whole system up to 24 bar. For pressure testing of only the valve, we can use other equipment and reach up to 40 bar. We measure torque on the valve up to 15000 Nm. The equipment can apply up to 20 MN of axial power, and up to 8 MN in tension. There are also opportunities to test four-point bending moments.

Density test according to EN 12266-1 from Rate A (no measurable leakage) to Rate G (2.0 * DN mm3 / s).

Certification according to Euroheat & Power's certification program EHP 003.

Deliveries

Close contact with the customer how the test set-up should be carried. After evaluation of the results, a report is written. The report is reviewed and if the results meet the requirements, an EPH 003 certificate is written.

Request for quote

CAPTCHA
This question is for testing whether or not you are a human visitor and to prevent automated spam submissions.

* Mandatory

By submitting the form, RISE will process your personal data.

Service

Shut-off valves for district heating networks

Instrument

Power / torque sensors, Thermometers, Pressure / Vacuum sensors

Metrology Area

Force and torque, Temperature, Pressure and vacuum

Certifications

Product certification

Delivery level

Accredited

Standards

EN 488:2019

EHP 003

EN 12266-1

Price

Price on tender

Delivery time

For a scheduled assignment, it will take about 15 working days to perform the test after we receive the item. Then it takes about 10 working days to get a report. The EHP-CC then takes another 10 working days.

Preparations

The test item and final order must be in place no later than 5 days before the specified test start.

Tom Lindström

Contact person

Tom Lindström

Projektledare

+46 10 516 53 50

Read more about Tom

Contact Tom
CAPTCHA
This question is for testing whether or not you are a human visitor and to prevent automated spam submissions.

* Mandatory By submitting the form, RISE will process your personal data.

Contact

Cannot find what you are looking for or are you curious about how we can help?

Send message
CAPTCHA
This question is for testing whether or not you are a human visitor and to prevent automated spam submissions.

* Mandatory By submitting the form, RISE will process your personal data.